Maintenance Kit - 5500 Includes Fire Rope for 5500, 2- Fan Covers FC546, 1- Tube of RTV Silicone and One Gallon Protech 300
The WoodMaster 5500 Yearly Maintenance Kit has everything you will Need to Tune Up your WoodMaster!
The Yearly Maintenance Kit Includes:
- Fire Rope
- Silicone (to mount Fire Rope and Seal around Chimney and other areas if needed)
- Fan Covers
- ProTech300 Boiler Treatment
WoodMaster recommends that all these parts be replaced Yearly!
This will greatly prolong the life of your Fans/Blowers and make your WoodMaster run like the day you bought it. You should drain all the water and refill your WoodMaster with fresh water also before adding the Boiler Treatment in. The whole job of replacing the maintenance parts should only take about 20 minutes. Easy Job... Be Self-Sufficient...
Watch Our Video about Maintenance
Product Description
This kit is all you need to keep your WoodMaster 5500 Model stove working like the day you bought it! Doing yearly maintenance is key in keeping your wood boiler running clean and efficiently year after year. This Kit Includes: Fire rope (9 feet of 1 inch rope) for the 5500 Wood Master door, 1- 10 oz. Black RTV silicone tube, 2- Fan Covers- FC546 and 1 Gallon of ProTech300. The ProTech300 has the highest level of protection for the wood boiler than other brand-name treatement. It offers 3 Active ingredients for Protection. The 3 "Levels" are 1. Nitrite 2. Phosphonate 3. Anodic Inhibitor.
Typical Applications
WoodMaster 5500 furnace
Features
- To replace FC546 fan cover, take the four screws out that hold cover over fan out and remove cover. Use 1/4" wrench to remove screws that are holding fan cover to fan and unhook old fan cover from laminated solenoid LS001. Change fan cover and do directions backwards.
- To install fire rope simply pull out old fire rope, scrap the area clean, apply bead of silicone in the channel and add rope. Yes it is that easy!